The Project

Key Benefits

  • Unparalleled reliability and dependability
  • Ideal for complex heating and cooling needs
  • Extremely high efficiency and economy
  • Powerful system with high-temperature water heating

Aquapark & Wellness Bohinj is a pool complex / hotel with more than 500m2 of swimming areas and 120 rooms.

Since the main attraction for the business is the pool complex, it was absolutely crucial that the HVAC system designed would be extremely reliable so that the risk of downtime would be minimized.

Using an existing water source, the 500kW system comprised of two TermoPlus® Aquapump units.

Underfloor heating was used throughout the building along with chilled beams, air curtains and ventilation ducts.

The project has achieved extremely low running costs compared to the previous system while at the same offers zero downtime operation. More importantly, the maximum outlet temperature of the old system was only 45 °C, compared to the 55 °C reached by the new system.

The System

Main unit & DHW:
2x 250kW Aquapump

Underfloor heating
throughout the building

Cooling:
Chilled Beams
Air curtains

Ventilation
Menerga Ventilation System